Butković: More than HRK 1bn for port infrastructure

Photo /slike/foto 4_21/foto MIN-DNZ 26-4_21/nsl MIN-DNZ 26-4_21.JPG
Transport Minister Oleg Butković said on Monday that in addition to current programmes, there is more than HRK 1 billion available from the National Recovery and Resilience Plant and the EU multiannual financial framework until 2027 for the reconstruction of the port infrastructure.
 
Butković visited the construction site for the modernisation and reconstruction of ports in Dubrovnik-Neretva County, including the Lapad waterfront which is being financed with a HRK 70 million grant.
 
"Never before has so much work been done on building and reconstructing the port infrastructure, primarily thanks to EU and national funds. This county has the most projects of this nature, eight, which are worth HRK 800 million," said Butković.
 
Dubrovnik Mayor Mato Franković said that the works to the Lapad waterfront should be completed in 30 months.
 
Dubrovnik-Neretva County Prefect Nikola Dobroslavić recalled that the county had absorbed HRK 6.7 billion in EU funds and was the most successful county in absorption.
 
Minister Butković will also visit the Trpanj port, which is being reconstructed for HRK 16 million, while on the island of Korčula he will visit two breakwaters under reconstruction. In Vela Luka he will sign a contract valued at HRK 75 million for the construction of a new ferry passenger terminal.
 
(Hina)

Announcements